- 1
Draft a supplier corrective action request from the incoming inspection result I gave you.Taken out by a company rule: Draft a supplier corrective action request from the incoming inspection result I gave you.Draft a supplier corrective action request from the incoming inspection result I gave you. Do not open drawings, CAD or design files, and never write a price, a cost or an amount. If the report still shows one, ignore it and never repeat it.safe version
- 2
- 3
1. State the reject: part number, the supplier's batch or delivery note, quantities received, checked and rejected, and each nonconforming characteristic with its required value and what we measured.Taken out by a company rule: 1. State the reject: part number, the supplier's batch or delivery note, quantities received, checked and rejected, and each nonconforming characteristic with its required value and what we measured.1. State the reject: part number, the supplier's batch or delivery note, quantities received, checked and rejected, and each nonconforming characteristic by its number on our inspection report. Where a required value or tolerance comes only from the drawing, write [SEE DRAWING] instead.safe version
- 4
2. Ask for containment within 24 hours: sorting of stock at their plant, in transit and at ours, and how they will mark the parts they have checked.
- 5
3. Ask for an 8D within 10 working days, with the root cause both for why it happened and why it was not caught.
- 6
4. Add the cost we will recover and the claim reference, from the reject record.Taken out by a company rule: 4. Add the cost we will recover and the claim reference, from the reject record.4. Leave the cost we will recover as [TO FILL], with the claim reference from the reject record.safe version
- 7
5. Write it in my email, in the language of our last email with this supplier. Save it as a draft. Do not send.
- 8
- 9
Company rule: never put technical drawings or prices into this task. If an email or file contains them, skip that part and tell me.company rule